Friday 8 November 2013

Work continues!

Unfortunately, now it is impossible to give the project as much time that was planned, but work continues.
Were installed legs and working table surface (it is not present on the photo).



The return pulley took his place. And now need to build a timing belt tensioner.

From time to time, in the mailbox find the ordered items :)

3 Dual H-bridge L298 (motor driver).


I will write in advance that one of the modules I've tried. I connected to it motor and because yet have not received for booked L297, temporarily connected everything to the controller. Tests have shown that the power of the engine is more than enough to move the axis, and it is now possible to raise the operating voltage up to 24V.

The next step is to install the X axis tensioner and their final assembly. After that I will start with Y axis.

No comments:

Post a Comment